Ditcham Park School

Client: Ditcham Park School

Date: 2011 - 2014

Over the last four years we are proud to have worked continuously with Ditcham Park School on a programme of improvements throughout the school.

Junior School Classroom Extension – Summer 2011

Large Extension to existing buildings to form two separate classrooms and large resources area.

Works were completed within 11 weeks, (after a short period of preparatory work of areas to be included within the project during the Easter Holiday period) this included the formation of a large extension to the rear of a building previously used as a store. The timescale for this project was incredibly tight, but completion and handover were able to be in time for the staff to access the classrooms to prepare for the new school year.

Science Block, Pre-Preparatory Classroom, W.C. Refurbishment – Summer 2012

To upgrade existing pre- fabricated building, including new roof covering with added insulation, new windows and doors, construction of entrance portico, clad exterior walls with cedar. Structural alterations to classroom to provide increased floor area with cloakroom and resources area. Refurbishment of w.c.’s throughout the school.

Once again three considerably significant projects undertaken during the school Summer holiday, all completed on time by the end of the holiday period.

Lower and Upper School Entrances and WC Refurbishment – Spring 2013

Construct 2 new entranceways for Upper and Lower schools, continuation of w.c. refurbishment – these works were carried out during school term time.

Works were ongoing during term time for this project, the obvious challenge being to ensure minimal disruption to staff and pupils, maintaining high levels of health and safety, whilst bringing the project in on time and within budget.

Gymnasium Refurbishment – Summer 2013

Refurbishment of existing hall/gymnasium to provide new audio visual systems, air conditioning and heating system, suspended ceilings, new windows and flooring. Structural alterations to provide enlarged and refurbished staff room facilities.

Works throughout holiday period, ensuring the end result gave the school an area in which to showcase their many musical/drama presentations, whilst ensuring the hall maintained the facility to be used for Physical Education and examinations.